ALLRITE Recover Roof

Halfway Bush Kindergarten Re-Cover Roof


Halfway Bush Kindergarten Re-Cover Roof Project Requirements At Halfway Bush Kindergarten, the existing roof needed a durable solution to address persistent leaks at the transition points. Industry Sector Education Solution After assessing the roof and considering the challenges of re-pitching, our approved applicators opted for a recover roof as the ideal solution.  Project Details Project Name: Halfway Bush Kindergarten Re-Cover Roof Applicator: Dunedin Roofing Systems and H2Off Waterproofing Products Used: Allrite Recover Roof with JM TPO Completed: Sept 2024 The Project  Roofing projects often come with unique challenges that require tailored solutions. At Halfway Bush Kindergarten, the existing roof needed a durable solution to address persistent leaks at the transition points.  Challenges  The kindergarten's...

Apollo Drive Recover Roof


Apollo Drive Recover Roof Project Requirements The aging roof of 33-35 Apollo Drive needed an urgent upgrade due to rust and leaks. Industry Sector Commercial Solution The ALLRITE Recover Roof system revitalised and extended the life span and effectiveness of this tired and aging roof. Project Details Project Name: Apollo Drive Recover Roof Applicator: Taurus Waterproofing Products Used: Allrite Recover Roof System including JM TPO membrane Completed: June 2024 The Project  Project Overview:   The aging roof of 33-35 Apollo Drive needed an urgent solution to address the shallow internal gutter which was causing large amounts of water ingress into the business below during heavy rain events. The existing roof consists of a 0.55 gauge trapezoidal profile...

Wintec S Block Recover Roof


Wintec S Block Recover Roof Project Requirements Provide a cost-effective re-roofing solution that would not disrupt the tenants.   Industry Sector Education Solution Allco's JM TPO ALLRITE Recover Roof Project Details Project Name: Wintec S Block Recover Roof Applicator: D & R Membrane Builder: Foster Maintain Architect: Chow Hill Architects Products Used: JM TPO Allrite Recover Roof Completed: October 2022 The Project  Project Requirement: To provide a cost-effective re-roofing solution that would not disrupt the tenants. Allco Solution: The building is being used as a music studio and had developed a number of leaks in the roof. After having presented Allco’s Recover roof to staff at ChowHill Allco was contacted by Philip Kempster to discuss whether our system was suitable....